Academy
Spot leak detector vs flow measurement
A new technical article comparing the architectures.
Read the article
Pre-launchAQUA Contra BASIC · Sign-ups from 01-01-2027 to 15-02-2027Sign up
Home/Cooperation/Installers
Partnership
Installers
Install AQUA Contra and H-corePLC® systems for your customers — with a commissioning protocol and manufacturer support.
01Book a presentation
02Property developers
03Wholesalers
04Design offices
05Installers
Draft text — prepared on the basis of the technical specification. Subject to client approval.
Partnership
Installers.
Installing the system is work installers already know: a hydraulic node at the service connection, a control cabinet and a flood probe. What makes the difference is correct execution and acceptance — which is why we have prepared a clear checklist and training.
Authorised installers receive jobs from private customers, wholesalers and property developers, as well as servicing of installed systems.
Installation training
Correct installation of the solenoid valve, water meter, probe and bypass — on the test rig.
Authorisation
Authorised installer status and referrals from the manufacturer.
Technical helpline
Support with commissioning, testing and diagnostics.
Service jobs
Periodic inspections and calibration of installed systems.
Details
Installation and acceptance checklist
01
Step
What to check
Requirement
1. Hydraulic node
EZ solenoid valve, water meter, mesh filter, non-return valve — according to the diagram
mandatory
2. Service bypass
Parallel bypass with a manual valve sealed in the closed position
mandatory
3. RE distribution board
Correct cabinet installation, power supply from a distribution board with surge protection
mandatory
4. Flood probe
2–3 mm above the floor, at the lowest point, in the run-off path; in a drain grate — in its upper part
recommended
5. Acceptance tests
Leak simulation, EZ shut-off, reset — positive result
mandatory
6. Protocol
Signed commissioning and handover protocol (operating and maintenance manual)
mandatory
Good to know
Requirements and good practice.
02
Installation pressure
Reference range 3.0–4.5 bar — check before commissioning.
Clear drains
A blocked drain grate can trigger an alarm state — inform the user about maintenance.
Service work
During servicing you open the bypass — the building is then without system protection.
Warranty
The warranty is conditional on complete installation and a signed protocol.
Process
How do we start working together?
03
01
Application
Form or phone.
02
Training
Demonstration and installation on the test rig.
03
First installation
Implementation with our technical support.
04
Authorisation
Partner status and regular jobs.
Questions
Frequently asked questions.
04
How long does installation take?
It depends on the installation. Allow time for the hydraulic node, distribution board, probe and tests with a protocol — we cover the details in the training.
Do I need electrical qualifications?
The control cabinet must be connected to the power supply — in accordance with applicable regulations and qualifications.
Who is responsible while the bypass is open?
While the bypass is open the building is not protected by the system — supervision lies with the technical staff or the user.
Deterministic protection
for your water system.
Biuro Inżynierskie Automatyki, Koszalin
+48 000 000 000
kontakt@h-coreplc.pl
Systems
AQUA Contra — overview
AQUA Contra DIY
AQUA Contra BASIC
H-corePLC® — overview
H-corePLC® szychta
H-corePLC® office
PLC2 for risers
Academy
State of the art
Case study
Flow vs spot leak detector
FAQ
About us
Our history
Our mission
Why us
Service
Partnership
Book a presentation
Property developers
Wholesalers
Design offices
Installers
Terms of sale
PDF · version 1.0
Technical, environmental and installation requirements
PDF · H-core technical specification
Privacy policy
GDPR · page
H-corePLC®
© 2026 H-corePLC® & AQUA Contra. All rights reserved.Terms · Privacy policy · Cookies
Pre-launchSign-ups 01.01–15.02.2027Sign up
Start/Cooperation/Installers
Partnership
Installers
Install AQUA Contra and H-corePLC® systems for your customers — with a commissioning protocol and manufacturer support.
01Book a presentation
02Property developers
03Wholesalers
04Design offices
05Installers
Draft text — prepared on the basis of the technical specification. Subject to client approval.
Installing the system is work installers already know: a hydraulic node at the service connection, a control cabinet and a flood probe. What makes the difference is correct execution and acceptance — which is why we have prepared a clear checklist and training.
Authorised installers receive jobs from private customers, wholesalers and property developers, as well as servicing of installed systems.
Installation training
Correct installation of the solenoid valve, water meter, probe and bypass — on the test rig.
Authorisation
Authorised installer status and referrals from the manufacturer.
Technical helpline
Support with commissioning, testing and diagnostics.
Service jobs
Periodic inspections and calibration of installed systems.
Details01
Installation and acceptance checklist
1. Hydraulic node
EZ solenoid valve, water meter, mesh filter, non-return valve — according to the diagram
Requirementmandatory
2. Service bypass
Parallel bypass with a manual valve sealed in the closed position
Requirementmandatory
3. RE distribution board
Correct cabinet installation, power supply from a distribution board with surge protection
Requirementmandatory
4. Flood probe
2–3 mm above the floor, at the lowest point, in the run-off path; in a drain grate — in its upper part
Requirementrecommended
5. Acceptance tests
Leak simulation, EZ shut-off, reset — positive result
Requirementmandatory
6. Protocol
Signed commissioning and handover protocol (operating and maintenance manual)
Requirementmandatory
Good to know02
Requirements and practice.
Installation pressure
Reference range 3.0–4.5 bar — check before commissioning.
Clear drains
A blocked drain grate can trigger an alarm state — inform the user about maintenance.
Service work
During servicing you open the bypass — the building is then without system protection.
Warranty
The warranty is conditional on complete installation and a signed protocol.
Process03
How to get started?
01
ApplicationForm or phone.
02
TrainingDemonstration and installation on the test rig.
03
First installationImplementation with our technical support.
04
AuthorisationPartner status and regular jobs.
Questions04
Frequently asked questions.
How long does installation take?
It depends on the installation. Allow time for the hydraulic node, distribution board, probe and tests with a protocol — we cover the details in the training.
Do I need electrical qualifications?
The control cabinet must be connected to the power supply — in accordance with applicable regulations and qualifications.
Who is responsible while the bypass is open?
While the bypass is open the building is not protected by the system — supervision lies with the technical staff or the user.
Deterministic protection
for your water system.
+48 000 000 000
kontakt@h-coreplc.pl
Koszalin
Systems
AQUA Contra — overview
AQUA Contra DIY
AQUA Contra BASIC
H-corePLC® — overview
H-corePLC® szychta
H-corePLC® office
PLC2 for risers
Academy
State of the art
Case study
Flow vs spot leak detector
FAQ
About us
Our history
Our mission
Why us
Service
Partnership
Book a presentation
Property developers
Wholesalers
Design offices
Installers
Terms of salePDF · version 1.0
Technical requirementsPDF · H-core specification
Privacy policyGDPR
H-corePLC®
© 2026 H-corePLC® & AQUA Contra
Terms · Privacy policy · Cookies