Before installation on site, the system should be “dry-tested” with only the power supply connected. Check the mechanical condition of the unit and that all components are correctly seated, and familiarise yourself with the system's functions.
Required functional tests
Wireless spot leak detector. After inserting the batteries, perform a water detection test. After 5 seconds of continuous detection, the system should trigger the EZ-OFF procedure. Correct response: the relay switches on, the ALARM LED lights up and the EZ-OFF status changes from ON to OFF. The system returns to standby after a reset.
Hose Threshold test. For the duration of the test, connect terminals Z11 and Z12 with a jumper. This starts an internal pulse generator that simulates the flow of a burst hose. Within 2–4 s the system should activate EZ-OFF and the alarm signalling. Remove the jumper after the test. In normal operation, terminals Z11 and Z12 must not be connected.
Pause function. Press the PAUZA button twice. The LCD display should show the PAUZA status and a 40-minute countdown.
Once the tests have been completed successfully, the system can be installed on site. During installation, check:
that the flow direction of all hydraulic components is correct,
that the power supply cable is connected correctly,
that the supply polarity is observed: L → Z1, N → Z2.
Detailed information on installation, testing and commissioning can be found in the operating and maintenance manual (DTR). The system is deemed commissioned once all requirements set out in the DTR have been met.